Bid #16-0816-SØ 2016 Demolition & Site Restoration-Lindenhurst

Addendum Q/A's


Monday, August 29, 2016

Q:  On the bid form under the additional items, you have tree removal listed. What does the 900 in the quantity column mean

A:  900 inches diameter. This is a quantity above and beyond what has been previously communicated regarding tree removal. 

Friday, August 26, 2016

NOTE:  The disconnection of water/sewer shall not require the removal of pavement.  If the water main is not accessible in right of way, then the abandonment should be completed at the B-box. The contractor shall coordinate with the City/water department for this operation. 

Q:  Where should the water be disconnected?

A:  Water should be disconnected at the main.

Thursday, August 25, 2016

Q:  I believe address 103 looks like it has a basement. The bid specs say no off-site fill may be brought on-site and we have to use on-site material to grade. I’m not sure how big the basement is but there may be a nice dip in the property that will hold water. Is that acceptable or should we add the price on bringing in some loads of fill for this property?

A:  No fill should be brought in for this project.   This site will be excavated in the future for a stormwater improvement project.  The footprint of structure should be smoothed to match adjacent grade with onsite material.

Q:  Do all the trees  and shrubs on the property need to be removed?

A:  YES. All trees and shrubs will need to be removed so that the site is clear of any and all materials.


Monday, August 22, 2016

NOTICE: BID OPENING DATE/TIME CHANGED

Bid opening has changed from Wednesday, August 31st at 10:00 a.m. to TUESDAY, August 30th at 3:00 p.m.


Q: Can a business team bidding on this project pool their insurance limits to meet the 4,000,000 General Aggregate limit and Products/completed operations limit? This request is for demolition and grading only.

A:  No, the General Liability Insurance General Aggregate Limit cannot be pooled.  However,  the insurance limits have been modified as follows:

(1) Liability Insurance Limits. The Contractor’s liability insurance, as required above, shall be written with limits of insurance not less than the following.

(a) Commercial General Liability Insurance

  • *General Aggregate Limit $2,000,000
  • Damage to Rented Premises Limit $0,500,000
  • Products/Completed Operations Limit $1,000,000
  • Personal and Advertising Injury Limit $1,000,000
  • Each Occurrence Limit $1,000,000* * The policy shall be endorsed for the *General Aggregate Limit to apply on a “Per Project” basis.

(b) Employer’s Liability Insurance

  • Bodily Injury by Accident (Each Accident) $1,000,000
  • Bodily Injury by Disease (Each Employee) $1,000,000
  • Bodily Injury by Disease (Policy Limit) $1,000,000

(c) Automobile Liability Insurance

  • Combined Single Limit (Each Accident) $1,000,000


*The CGL policy shall be endorsed to provide that the General Aggregate limit applies separately to each of the contractor’s projects away from premises owned or rented to contractor.

 

(Please login to post a question)