Q: Where can I locate a signage schedule for this project? 

R: Signage quantities are indicated In Specification Section 10 14 00; Paragraph 3.03A & B.

Q. Could you help me with clarifying the type of fume hood they are looking for in Dental Lab 158 and 162? I found the spec for them but they don’t list any manufacturers and this seems more like a kitchen exhaust fan that a true fume hood.

R: The hood specified is an exhaust hood and not a fume hood.  Provide an exhaust hood as specified.

Q. Please find the attached letterhead, substitution request form, submittal drawings from the completed Performing Arts Center project & a company brochure. GSI seeks approval as a qualified supplier of signage for the Zion Medical Clinic Renovations project. We would manufacture ADA compliant panels utilizing VistaSystems anodized aluminum extruded curved face frames that would be mounted to a backer material by GSI. This substitution would cause no change in schedule or require redesign to other portions of this project.

R: We will not be accepting any substitution on the signage specs as provided in the Bid documents.

 

UPDATED MONDAY JULY 31, 2017 9:06 AM CST

BID OPENING DATE HAS BEEN EXTENDED TO TUESDAY, AUGUST 8, 2017 @ 2:00 PM.

The revised  plans and specifications have now been uploaded in their entirety on the Purchasing Portal.  The new plans and specifications include all previously noted specification section and plan updates per the Addendum #1 blog PLUS the following:

Invitation to Bid Form has been updated noting a new BID OPENING DATE OF TUESDAY, AUGUST 8, 2017 @ 2:00 PM and the last day for formal questions has also been updated to read August 1, 2017 at Noon central time.

Section 00 11 15 – Lake County Health Department Invitation to Bid Terms & Conditions attachment has been updated to include a revised bid opening date as noted on Page 2 of the attachment; Paragraph 2 to be Tuesday, August 8, 2017.  The cut-off date for contractor questions has been revised to the Noon Central Time August 1, 2017.

Section 00 31 24 – Environmental Assessment Information has been revised in its entirety.

Section 01 21 00 – Allowances has been revised in its entirety.

The following specifications sections have been revised to include previously noted Addendum #1 Blog items.  (Refer to bold text in the following specification sections):
• 00 01 10 – Table of Contents: Revised Page numbers from quantity 7 to quantity 8 for Section 08 80 00 – GLAZING.
• 02 41 00 – Demolition:  Added Paragraph 3.03H.
• 00 30 00 – Cast-In-Place Concrete: Added Sub-Paragraph 2.04J3.
• 04 20 00 – Unit Masonry: Revised Sub-Paragraph 2.02A2.
• 08 11 13 – Hollow Metal Doors & Frames:  Added Sub-Paragraph 2.01A5.
• 08 80 00 – Glazing: Revised Paragraphs 2.04A & B.

 

 

UPDATED 3:20 PM CST 7/26/17

~~This Addendum forms a part of the Contract Documents and modifies the Bidding Documents dated July 11, 2017, with amendments and additions noted below. Acknowledge receipt of this Addendum in the space provided in the Bid Form. Failure to do so may subject the Bidder to disqualification.
REVISED DRAWINGS A310, A320, A800 AND A820 PLEASE VIEW BY GOING TO BID DOCUMENTS


CONTRACTOR QUESTIONS AND FORMAL RESPONSES


Question 1:  The fuse Marker paint (P6) is called out in room 100 Multi-Purpose; it is on the North wall.  One note reads marker board wall paint install floor to ceiling. On the room schedule the north wall is calling for p1/p6 which is an indication that there is PA (eggshell) sw6149 Relaxed Khaki and PF (fuse) on the north wall. On the interior elevations it does not show where the marker board will go. The north wall is approximately 52lf and the height is 8’. If the marker board is to be on the entire wall minus the door and frame, what about the side walls. Need a clarification about the extent of the marker board in that room.


Response 1: The drawings correctly indicate the intent.  The Fuse Marker paint (P6) shall be installed on North wall from inside edge of drywall "bump outs" (Reference Lines E6/D6) at Door
100.3 from floor to ceiling to Northwest (Reference Lines F6) and Northeast (Reference Lines C6) corners of the room.  The Drywall Bump Out at the exterior door opening gets painted with P1 Eggshell - Color PA.
 
Question 2: Will we be required to submit Certified Payroll verification for payout requests?


Response 2: Yes.  Refer to Specification Section 00 72 00 - General & Supplementary Conditions attachment; Paragraph 7 - Applications for Payment.


Question 3: Per A310- Is a rail required @ (1) side only @ pedestrian walk near 6/C?  None required @ bldg side? ( Note 5.091 reads “...do not anchor into face of existing masonry wall.”


Response 3: An interior side hand rail is required to be installed on the interior side of the ramp and shall be fastened into the existing masonry wall.  General Contractor shall coordinate fastening points into the masonry surfaces. Refer to revised Sheet A310 for more information. The guardrail that has keynote 5.091 on Detail 1/A310 shall NOT be anchored into the masonry wall.  The entire guardrail assembly shall be cored into the concrete walkway as keynoted.


Question 4: Are any rails required elsewhere? ie: @ interior/ exterior stairs @ south end of bldg. near 1/C?


Response 4: No.


Question 5: Per A910- Dtl’s 3 & 5 indicate 2 1/2” sq. tubes @ 42” o.c.  Can you provide quantity? I’m having difficulty locating/ determining.


Response 5: The tubes are only to be installed inside the half wall between the intake windows in Room 120 - Reception at the east side of the room. Only one location for the tubes exist.  Two total tubes are required at each end of the half wall for lateral stability of the casework assembly.


Question 6: Per A800 & corresponding dtl’s on A820- (15) doors are indicated to have steel lintels per dtl’s 6 & 14/ A820, but are the beams per S320 meant to be acting as lintels?


Response 6: No new steel is placed directly above door head.  Steel beams on S320 are acting as the lintels to span over the openings.  These will be erected tight to the underside of the precast as detailed on the structural drawings and as shown in added detail 15/A820.  Detail 6/A820 has been revised to indicate that the masonry and lintel over the head of the new door frame are for existing masonry openings that already have lintels above former door opening scheduled to be reused. The existing steel lintel and masonry are existing to remain in place in the reused
opening. Detail 15/A820 has been added and correctly keyed into the updated Door, Frame, & Hardware Schedule on Sheet A800 for new opening locations.  Added detail 15 indicates that no lintel or masonry is needed immediately above the new door frame at the HEAD locations as scheduled.  The interstitial space above the new door frames to the steel supporting the existing precast roof planking shall be infilled with drywall and insulation as shown in new detail 15/A820.
 
Question 7: And, lintels @ most of the doors where no beam is shown, ie: 101, 104, 106, 116, 142, 145, 147, 166 & 173(.1), & 166 & 173(.2), are indicated as existing per S320, – no new lintels required?


Response 7: No steel placed directly above door head.  Steel beams on S320 are acting as the lintels to span over the openings.  These will be erected tight to the underside of the precast as detailed on the structural drawings.  Refer to response # 6 above and refer to revised Door, Frame, & Hardware Schedule on Sheet A800.


Question 8: Can you provide width of G1z interior partitions? & just to verify, no bottom plates are required on B1/ B2 beams per S320?


Response 8: The G1z wall assembly is 1-5/8" Mtl. Studs & 5/8" Gypsum Board for a total of 2-1/4" however the studs shall be installed 1/4" off the face of the exterior wall for the 2-1/2" dimension indicated on the G1z wall type. No bottom plates required.


Question 9:  Also per S320- width of brg. plates is given as 7” typical for B1 / B2 beams but width of beams is 7.995” & 10” respectively so those won’t work. Revise?


Response 9: Provide bearing plates as noted on the drawings


Question 10: Also, FYI- Plan on giving add for the (8) extra beams indicated per S320 beam & plan on figuring all beams except ones connecting to columns furnished only schedule, to be set by mason. We’ll then come back & weld to bearing plates


Response 10:  No Comment. Means and methods GC coordination issue.


Question 11:  Please provide section views for the infill walls at the removed PTAC units.


Response 11: Section views are not available.  Infill removed PTAC openings as noted in Keynote 4.212 on Sheet A210.  Existing wall construction at removed PTAC units shall be bid to be 8" load bearing CMU interior with 4 inch modular brick masonry veneer and an airspace with polyisocyanurate board insulation.


Question 12:  Per drawing A810 Finish Remark 5 all Window sills and trim are SSA but there are no references to SSB. Please provide direction as to what gets finish SSB


Response 12: All countertops and window sills shall be the same color; SSA.  SSB is not used on this project.


Question 13:  Will there be any work required for placing additional attic or roof insulation?
 
Response 13: No.


Question 14:  Per Spec Section 05 50 00 Section 2.05 A2 for Metal Fabrications, Spray fireproofing is mentioned but not referenced in the drawings. Please confirm if spray fireproofing will be required on the new steel members.


Response 14: There is no spray fireproofing on this project. All steel members shall be prepared as noted in Specification Section 05 50 00 - Metal Fabrications; Paragraph 3.04.


CHANGES TO SPECIFICATIONS
1.1 SECTION 03 30 00 - CAST-IN-PLACE CONCRETE
A. Under Article 2.04  ADMIXTURES:
1. Add new Subparagraph J3 as follows:
"3.  Other Acceptable Product meeting or exceeding the minimum performance requirements of Specified Products; ISE Logik Industries, Inc.; MVRA 900: www.iselogik.com.

CHANGES TO THE DRAWINGS
2.1 DRAWING A310 - FLOOR PLAN
A. Add wall mounted, interior handrail (Keynote 5.093) at the west side of the ramp near Door Opening 116.1; revision cloud 2. (Drawing Attached).
B. Add location of the bronze plaque (Keynote 10.143) at vestibule 117 and building address numerals (Keynote 10.146) at exterior entrance canopy; revision cloud 2. (Drawing Attached).
2.2 DRAWING A800 - DOOR, FRAME, & HARDWARE SCHEDULES
A. Revise Door and Frame Schedule for Door openings 118.1, 118.2, 163.1 & 169.1 to read 15/A820 in lieu of 6/A820 as orifginally scheduled.  (Drawing Attached)
2.3 DRAWING A820 - DOOR DETAILS
A. Revise Detail 6/A820:  Indicate existing masonry (Keynote 2.041) and existing steel lintel (Keynote 2.053) above door head.
B. Added Detail 15/A820: Added Head Detail as indicated.

 

UDPATED JULY 25, 2017


Question 1: I am looking at this project and need clarification On L-100 the details call for plant key CAKF. This is not on the plant list, could you find out what it is?


Response 1: CAKF is Calamagrostis x acutiflora ‘Karl Foerster’.


Question 2: With regards to the glass make up for the Zion Medical Clinic 1) Will they accept an alternate to the Solera L (SG3)?.


Response 2: Glass types SG1 & SG3 have been modified by this addendum.  See revisions to the glass specifications in "CHANGES TO SPECIFICATIONS" below.


Question 3:  As far as SG1, please verify the make-up versus the performance, as any greylite product will not come anywhere near the VLT.
 
Response 3: Glass types SG1 & SG3 have been modified by this addendum.  See revisions to the glass specifications in "CHANGES TO SPECIFICATIONS" below.


Question 4: For the building demolition, will we be responsible for capping utilities or will the owner set that up?  If we are responsible for capping utilities, to what point should they be removed/capped?


Response 4: The General Contractor is responsible to coordinate utility disconnection and capping with the local utility companies as Base Bid. Please see response to Question 7 below.


Question 5:  Per Spec Section 06 41 00 there is a reference to certification through A.W.I. Please confirm, is certification a requirement for bidding as this will greatly limit the potential competition among our subs.  NOTE: Regardless of certification status, our subs still fabricate per A.W.I. Standards Sec.400b (Custom Grade).


Response 5: Cabinets shall be constructed to AWI Premimum Grade in accordance with Specification section 06 41 00; Paragraph 2.01A.  There is no specified requirement for the fabricators shop to be AWI Certified.


Question 6: Referencing Keynote 7.240 at Photo 4 on drawing A1010, please clarify the extent of patching required at the EIFS fascia.  The photo provided does not capture the entire area of existing EIFS and it’s unclear if the area highlighted in the photo is intended to indicate the extent of patching or just the re-coating.  If the extent of required patching is unknown, please stipulate a quantity to be included for bidding purposes.


Response 6: Patching shall be required at the entrance canopy where former building signage or exterior wall penetrations have been removed. There is approximately 150 square feet of patching required.  The balance of the upper canopy gets fully recoated after the EIFS patching is performed.


Question 7: The drawings show no detail of utilities to be disconnected from the building to be demolished. Please clarify size, location, termination point, and any subsequent site repair.


Response 7: No utilities are to be disconnected at 1911 - 27th Street.  All existing utilities at this location shall be reused.  The existing Zion Clinic located at 1819 - 27th Street is a single story structure with a full basement.  The first floor is approximately 14 feet in height and the basement is approximately 12 feet deep. This building is to be demolished in its entirety.  The building is 2,459 square feet at the first floor and 2,459 square feet at the basement floor.  The total building square footage is 4,918 Square Feet in size.  Existing utilities at 1819 - 27th Street shall be removed from the building to the point of connection at the public utility main and terminated in
accordance with utility company direction.  A new power service at this site shall be provided to the small shed on the west property line utilizing the existing overhead utility pole as shown on Sheet
 
E100 - Electrical Site Plan.  Also refer to Specification Section 02 41 00 - Demolition for additional requirements.


CHANGES TO SPECIFICATIONS
1.1 SECTION 02 41 00 - DEMOLITION
A. Under Article 3.03  EXISTING UTILITIES:
1. Delete Subparagraph 3.03H and replace with the following:
"H.   Prepare building demolition areas by disconnecting and capping utilities outside the demolition zone at existing utility mains; identify and mark utilities to be subsequently reconnected, in same manner as other utilities."
1.2 SECTION 04 20 00 - UNIT MASONRY
A. Under Article 2.02 BRICK UNITS:
1. Delete Subparagraph A2 and replace with the following:
"2.  (Type B2 - Buff Blend Color):  Sioux City Brick; Gas Burn Matt # 220; Modular Size 4" x 2 2/3" x 8" Nominal with textured face to match existing."
1.3 SECTION 08 11 13 - HOLLOW METAL DOORS AND FRAMES
A. Under Article 2.01 MANUFACTURERS:
1. Add acceptable Manufacturer, Sub-Paragraph A5 to read:
"5.  Mesker Openings Group: www.hollowmetalsubmittal.com."
1.4 SECTION 08 80 00 - GLAZING
A. Under Article 2.04  INSULATING GLASS UNITS:
1. Delete Paragraph 2.04 A & B and replace with the following:
"A. Type SG1 - Sealed Insulating Glass Units:  Tinted vision glass, double glazed.
1. Application:  All exterior glazing unless otherwise indicated.
2. Outboard Lite:  Fully tempered float glass, 1/4 inch thick.
a. Tint:  PPG Solarban 60 on Optigray Low-E #2.
b. Coating: Low-E (passive type), on # 2 surface.
3. Inboard Lite:  Fully tempered float glass, 1/4 inch thick, minimum.
a. Tint: Clear.
b. Cavity:  1/2 inch (90% Argon Fill).
4. Total Thickness:  1 inch.
5. Thermal Transmittance (U-Value), Summer - Center of Glass: 0.22, nominal.
6. Thermal Transmittance (U-Value), Winter - Center of Glass: 0.24, nominal.
7. Total Visible Light Transmittance: 50 percent, nominal.
8. Total Solar Heat Gain Coefficient: 0.29 percent, nominal.
9. Shading Coefficient:  0.34 percent, nominal.
10. .  Glazing Method:  Gasket glazing.
B. Type SG3 - Sealed Insulating Glass Units: Frosted translucent glass, double glazed.
1. Application:  As indicated on Drawings.
2. Outboard Lite:  Fully tempered float glass, 1/4 inch thick.
 
a. Tint:  PPG Solarban 60 on Optigray Low-E #2.
b. Coating: Low-E (passive type), on # 2 surface.
3. Inboard Lite:  Fully tempered float glass, 1/4 inch thick, minimum.
a. Tint: Acid-Etched White # 3.
b. Cavity:  1/2 inch (90% Argon Fill).
4. Total Thickness:  1 inch.
5. Thermal Transmittance (U-Value), Summer - Center of Glass: 0.22, nominal.
6. Thermal Transmittance (U-Value), Winter - Center of Glass: 0.24, nominal.
7. Total Visible Light Transmittance: 50 percent, nominal.
8. Total Solar Heat Gain Coefficient: 0.29 percent, nominal.
9. Shading Coefficient:  0.34 percent, nominal.
10. .  Glazing Method:  Gasket glazing."

CHANGES TO THE DRAWINGS
2.1 DRAWING A320 - ROOF PLAN
A. Revise Keynote 7.717 to read: "7.717  Existing roof hatch to be removed and replaced in its entirety under Base Bid.  General Contractor shall remove existing wood roof curbing and wood roof hatch and discard.  Existing asphalt shingles around the perimeter of the roof hatch shall be removed and replaced to match exisrting color and to accommodate the new roof hatch size. General Contractor shall reframe wood opening with treated wood as required to accommodate new roof hatch.  New roof hatch shall be Manufacturered by Bilco: Type: S-50TB; Thermally Broken type insulated to R-20.  Size: 30 x 36 inches single leaf. Cover: 11 gauge aluminum. Curb: 12" Height (insulated) R-20. Hinges: Stainless Steel. Locking:  Exterior latching lever with padlock hasp option to be secured from exterior." Drawing Sheet A320 has been revised and attached to this Addendum for bidders information.

Please view Bid Documents for updated drawing A320 

 

PLEASE NOTE THAT THE SITE TOUR SCHEDULED HAS BEEN CANCELLED FOR Wednesday  July 26 1:00-2:30PM new site only LCHD Clinic 1911 27th St. Zion IL  60099

ADDENDUM 1.

QUESTION: Looking for clarification on CCTV and Door Access specifications ?

RESPONSE: Base Bid:  Contractor to provide open raceways for these system to accessible ceilings.

An Allowance of $85,000.00 shall be carried in the GC Base Bid per specification section 01 21 00 – Allowances.  The General Contractor shall employ the Owner’s Security Vendor (Precision Controls of Illinois) to furnish and install these systems under the allowance. We feel this is clearly indicated in the bid package.

Additional Site tours will be conducted at :

Friday July 21, 2017 8 -8:30 AM first at the current LCHD Zion Clinic 1819 27th St. Zion, IL 60099  followed by site visit/tour at the new  LCHD Zion Clinic site at 1911 27th St. Zion IL 8:30 – 10:00 AM

Wednesday  July 26 1:00-2:30PM new site only LCHD Clinic 1911 27th St. Zion IL  60099

PLEASE NOTE THE FOLLOWING:

ILLINOIS DEPARTMENT OF LABOR
Bruce Rauner Joe Beyer
Governor Acting Director
July 10, 2017


Dear Public Official,
The Illinois Department of Labor has reviewed the Prevailing Wage schedule that was published on May 26, 2017 (These rates took effect on June 5, 2017). Following the review, we have corrected some of the rates in your county. We have posted the corrected schedule and the revised items have been highlighted in the rate schedule.