January 15, 2018
5. Q. If a company participates as part of the planning and developing team (i.e., they help prepare the bid documents) will they be prohibited from bidding on the work?
A.Yes, this would put the designing firm at an unfair advantage.
6. Q. Has a vacancy date been established with Transitional Care of Lake County, LLC, which leases and manages the facility?
A. Yes, Spring/Summer 2019
7. Q. In Part D the second bullet, it asks about value engineering. Mentioned specifically are optimizing lifecycle, energy consumption and operational costs. I was under the impression that this is a demolition and did not have any new construction associated with it. Is that correct? If so, are you looking for how we approach value engineering for a general new construction project, or are you looking for something else?
A.Yes, this SOI is for the demolition of the Winchester House.We’re looking for how you approach value engineering for any project.
January 11, 2018
4. Under Submittals Section G. A/E Consultant Form is listed as a major section. Is this form available online?
A: No. The form or forms required are enclosed within the document. The general information sheet, references, and firm qualifications as well as what is outlined on page 5 submittals A-F.
January 9, 2018
1. Q: Can Lake County provide CAD’s of campus utility plans/can Lake County provide CAD’s campus tree inventory?
A: Lake County has background engineering and survey drawings relative to a number of different campus attributes. These information will be shared with the selected firm.
2. Q: Can Lake County provide pictures of the generators to be salvaged?
A: Please see attached.
3. Can Lake County designate the age of the building additions on the floor plan
A: Please see attached.
January 8, 2018
Attendees of the Facility walk through can be seen here. Click Here.