Addendum #1

Question: Is the in-person pre-submittal meeting scheduled for 2/19/2025 mandatory?

Answer: No, the pre-bid meeting is not mandatory.

Addendum #2

Attached: Sign-In Sheet from the Pre-Bid Meeting held 2/19/2025.

Addendum #3

Question: Can pay items be added for the 4", 6", 8" and 12" non-pressure connections or are they incidental? 

Answer: Non-Pressure connections are considered incidental to open cut water main items of the respective pipe diameters, per Project Manual Section 01 29 76 – Payment Procedures.

Question: Can the contractor choose to add additional drill pits and complete the drills in shorter runs or do they have to be completed as shown on the plans?

Answer: The Contractor may choose to add additional pits to the locations shown in the plans. All costs for trench backfill, pavement replacement, and/or landscape restoration as a result of additional drill pits shall be the responsibility of the Contractor.

Question: Plan sheet 11 shows some 10" PVC water main pipe. Can a pay item be added for this work?

Answer: 10” PVC C900 pipe is listed as incidental to the “Non-Pressure Connection Special, 10-Inch PVC to HDPE Electrofusion Fitting…” Item, per Project Manual Section 01 29 76 – Payment Procedures. This is the only project location identified with 10” PVC pipe and a length of 6 feet is listed on the plans to show the intent of a minimal length of pipe required between the 10x12 reducer and the electrofusion transition fitting.

Addendum #4

Pages B-3 and B-4 of the original Bid Documents have been modified. Please substitute the the attached: 7.5 Bid Form Unit Prices Addendum

Bidding Plan Drawings #12, 13, 18, and 30 have been replaced. See attached: 2025.02.28 - L0040070 - Gages Lake WM - Addendum 4 Plan Sheets

Additional detail is provided here: Addendum 4 Text